AEE.
Deterministic computational modeling for heavy engineering. Cost, material, and structural estimations at industrial scale.
The platform at a glance.
What AEE is.
AEE is a high-fidelity estimation platform for large-scale industrial and civil engineering work. Where conventional estimation tools depend on lookup tables and human pattern-matching, AEE generates structured cost, material, and load estimates from an integrated model of the project, the supply chain, and the regulatory regime.
Capabilities.
Project-grounded cost modelling
Cost estimates generated against a structured model of the project rather than against historical averages.
Material and load estimation
Structural and material requirements derived from the model. Designed to integrate with downstream BIM and structural-analysis tooling.
Supply-chain awareness
Live integration with material and labour markets. Estimates carry an explicit price-of-time component.
Audit-ready output
Every estimate carries the inputs, assumptions, and decision path. Built for environments where estimates anchor procurement decisions.
How it sits inside the Group.
AEE composes against the XSIS substrate for inference. The platform is currently in restricted development; first counterparties are scheduled to onboard in 2026.